Changes for page R18 Docker - Double Lane
Last modified by Erik Bakker on 2025/10/10 09:12
From version 28.1
edited by Erik Bakker
on 2025/10/09 10:16
on 2025/10/09 10:16
Change comment:
There is no comment for this version
To version 14.1
edited by Erik Bakker
on 2023/08/03 16:16
on 2023/08/03 16:16
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Title
-
... ... @@ -1,1 +1,1 @@ 1 -R1 8Docker - DoubleLane1 +R10 Docker - Double lane - Content
-
... ... @@ -1,19 +1,19 @@ 1 - **Non-service-affecting**finaltemplate tousethe*R18*doublelanerelease.1 +Non-service affecting R10 template that unlocks the possibility of running a failover configuration on an MQTT Broker. 2 2 3 3 **Process** 4 - To use the new R18release ofourcloud templatewe upgrade in one step. This step is non-service-affecting.4 +We upgrade in one step to use the new R10 release of the cloud template. This step is non-service affecting. 5 5 6 6 **Overview** 7 - *Updateversions ofdependencies.7 +It adds the possibility of hosting an MQTT broker in a failover setting. 8 8 9 -**Update Steps**10 -* UsethefinalR*18* template(non-serviceaffecting)(duration: < 5 minutes)9 +**Updates** 10 +* Run an MQTT broker in a failover setting 11 11 12 +**Update Steps** 13 +* Use the final template (non-service affecting) (duration: 10 minutes) 14 +** This step will update your cloud slot configuration to allow an MQTT broker with failover settings. 12 12 * User actions after applying the final template: 13 -** Check if all runtimes are up viatheruntimeoverview orDeploy Architecture14 -** Check if all runtimes have been installed according to the active release15 -** Check if messages pass through the busby verifying a critical message flow in external systems16 +** Check if all runtimes are reachable by Deploy Architecture. 17 +** Check if all flows have been installed according to the active release. 18 +** Check if messages pass through the model by verifying a critical message flow in external systems. 16 16 17 -**Remarks** 18 - 19 -Deadline of December 14th, 2025