Changes for page R20 Docker - Double Lane
Last modified by Erik Bakker on 2026/02/10 10:51
From version 32.1
edited by Erik Bakker
on 2026/02/10 10:51
on 2026/02/10 10:51
Change comment:
There is no comment for this version
To version 26.1
edited by Erik Bakker
on 2025/06/30 09:51
on 2025/06/30 09:51
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Title
-
... ... @@ -1,1 +1,1 @@ 1 -R 20Docker - Double Lane1 +R17 Docker - Double Lane - Content
-
... ... @@ -1,50 +1,17 @@ 1 - === IntermediateTemplate-ReleaseNotes===1 +**Service affecting** final template to use the R16 double lane release. 2 2 3 -**Non-service affecting** intermediate template to use the R20 double lane release. This is the first of two steps for your upgrade to the new R20 template. 4 - 5 5 **Process** 6 - To use the new R20release ofourcloud template weupgrade in twosteps, withonlythesecondstepbeingservice affecting.Belowis the firststep.4 +o use the new R17 template on your environment, we replace all connections to activate the new configuration. This update is service affecting and aims to enable data traffic via our new carwash. 7 7 8 8 **Overview** 9 -* Security improvements to the eMagiz infrastructure 10 -* Update Ubuntu version 11 -* Update Docker version 12 -* Update control agent version 13 -* Update Authorization Server (if applicable) 7 +* New connections to a **new** carwash. 14 14 15 15 **Update Steps** 16 -* Use this intermediate R20 template (non-service affecting)(duration: 15 minutes) 17 -** This step will upgrade the backup machines hosted in the second Availability Zone in your cloudslot. 18 -** The network drive containing the Artemis queue store and your Elastic IPs will remain. 19 -** The runtimes on the machines will be restored using the active release in the eMagiz portal 20 -* User actions after applying the intermediate template: 21 -** Check if all ".02" runtimes are reachable by the runtime dashboard 22 -** Check if all flows have been installed according to the active release 23 -** Check if messages pass through the bus by verifying a critical message flow in external systems 10 +* Use the final template (non service affecting)(duration: < 10 minutes) 11 +** This step will replace all connections. 24 24 25 -**Remarks** 26 - 27 -To allow the user to have more control of the upgrade process we now allow to upgrade to the intermediate template as a seperate step. This gives you the option to wait longer before updating the **service affecting** final template. In this time you can do additional verifications on your model. 28 - 29 -=== Final Template - Release Notes === 30 - 31 -**Service affecting** final template to use the R20 double lane release. 32 - 33 -**Process** 34 -To use the new R20 release of our cloud template we upgrade in two steps, with only the second step being service affecting. Below is the remaining step. 35 - 36 -**Overview** 37 -* Security improvements to the eMagiz infrastructure 38 -* Update Ubuntu version 39 -* Update Docker version 40 -* Update control agent version 41 -* Update Authorization Server (if applicable) 42 - 43 -**Update Steps** 44 -* Use the final R20 template (non-service affecting)(duration: 15 minutes) 45 -** This step will upgrade the primary machines in the first Availability Zone in your cloudslot. 46 -** The runtimes on the machines will be restored using the active release in the eMagiz portal. 47 47 * User actions after applying the final template: 48 -** Check if all ".01"runtimes arereachablebythe runtimedashboard49 -** Check if all flows have been installed according to the active release14 +** Check if all runtimes are up via the runtime overview or Deploy Architecture 15 +** Check if all runtimes have been installed according to the active release 50 50 ** Check if messages pass through the bus by verifying a critical message flow in external systems 17 +