Changes for page R22 Docker - Double Lane
Last modified by Erik Bakker on 2026/06/29 09:47
From version 24.1
edited by Erik Bakker
on 2025/01/20 07:40
on 2025/01/20 07:40
Change comment:
There is no comment for this version
To version 36.1
edited by Erik Bakker
on 2026/06/29 09:47
on 2026/06/29 09:47
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Title
-
... ... @@ -1,1 +1,1 @@ 1 -R 15Docker - Double Lane1 +R22 Docker - Double Lane - Content
-
... ... @@ -1,24 +1,20 @@ 1 - Service affectingfinaltemplate tousetheR15doublelane release.1 +{{info}}This environment template needs to be applied on all environments of all (your) models before August 29th, 2026{{/info}} 2 2 3 +**Non-service affecting** final template to use the **R22** double lane release. This is the only step for your upgrade to the new **R22** template. 4 + 3 3 **Process** 4 - To usethe new R15 release of our cloud template we upgrade intwo steps,withonlythesecondstepbeing serviceaffecting.Thegoalof this updateis to increasethe securityof the disksrelatedto your machineby encrypting them and to updatethecontrol agent versionto 2.21.4 for **all** machines.6 +We upgrade in one step to use the new **R22** release of the cloud template. This step is non-service affecting. 5 5 6 6 **Overview** 7 -* Security improvementstotheeMagiz infrastructure.8 -* Update controlagentversion.9 +* Improve internal monitoring and alerting capabilities 10 +* Improve management of users and permissions 9 9 10 10 **Update Steps** 11 -* Use this intermediate template (non service affecting)(duration: 10 minutes) 12 -** This step will upgrade the backup machines hosted in the second Availability Zone in your cloudslot 13 -*** The network drive containing the Artemis queue store and your Elastic IPs will remain. 14 -* Use the final template (service affecting)(duration: 10 minutes) 15 -** This step will upgrade the primary machines in the first Availability Zone in your cloudslot 16 -*** The network drive containing the Artemis queue store and your Elastic IPs will remain. 17 -** This step will upgrade the control agent version on **all** machines (cloud and on-premise) to version 2.21.4 18 -*** The runtimes on the machines will be restored using the active release in the eMagiz portal 19 - 13 +* Use the final **R22** template (non-service affecting) (duration: 10 minutes) 14 +** None of the runtimes will be touched. 15 +** Authorization servers will perform a rolling update. 20 20 * User actions after applying the final template: 21 -** Check if all runtimes are up viatheruntimeoverview22 -** Check if all runtimes have been installed according to the active release23 -** Check if messages pass through the busby verifying a critical message flow in external systems17 +** Check if all runtimes are reachable by Deploy Architecture. 18 +** Check if all flows have been installed according to the active release. 19 +** Check if messages pass through the model by verifying a critical message flow in external systems. 24 24