Changes for page R23 Docker - Double Lane
Last modified by Erik Bakker on 2026/07/31 13:52
From version 25.1
edited by Erik Bakker
on 2025/04/07 10:15
on 2025/04/07 10:15
Change comment:
There is no comment for this version
To version 37.1
edited by Erik Bakker
on 2026/07/31 13:52
on 2026/07/31 13:52
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Title
-
... ... @@ -1,1 +1,1 @@ 1 -R 16Docker - Double Lane1 +R23 Docker - Double Lane - Content
-
... ... @@ -1,19 +1,18 @@ 1 - **Non-serviceaffecting**finaltemplate tousetheR16doublelane release.1 +{{info}}This environment template needs to be applied on all environments of all (your) models before August 29th, 2026{{/info}} 2 2 3 +**Non-Service affecting** final template to use the **R23** single lane release. This upgrade is non-service-affecting. 4 + 3 3 **Process** 4 - To use the new R16release ofourcloud templatewe upgradeinonesteps,the updateis nonservice affecting.This update aims to increase the stability of models running in Production.6 +We upgrade in one step to use the new **R23** release of the cloud template. This step is non-service affecting. 5 5 6 6 **Overview** 7 -* Security improvements to the eMagiz infrastructure. 8 -* Update control agent version. 9 +* Update authorization server to version 1.2.4, providing a bugfix for certificate rotation. 9 9 10 10 **Update Steps** 11 -* Use the final template (non service affecting)(duration: 3 minutes) 12 -** This step will upgrade the machines in your cloudslot 13 -*** The network drive containing the Artemis queue store and your Elastic IPs will remain. 14 - 12 +* Use the final **R23** template (non-service affecting) (duration: 10 minutes) 13 +** None of the runtimes will be touched. 14 +** Authorization servers will perform a rolling update. 15 15 * User actions after applying the final template: 16 -** Check if all runtimes are up via the runtime overview 17 -** Check if all runtimes have been installed according to the active release 18 -** Check if messages pass through the bus by verifying a critical message flow in external systems 19 - 16 +** Check if all runtimes are reachable by Deploy Architecture. 17 +** Check if all flows have been installed according to the active release. 18 +** Check if messages pass through the model by verifying a critical message flow in external systems.