Changes for page Failover - Deploy Possibilities
Last modified by Erik Bakker on 2024/09/27 14:07
From version 28.15
edited by Danniar Firdausy
on 2024/09/25 13:13
on 2024/09/25 13:13
Change comment:
There is no comment for this version
To version 28.17
edited by Danniar Firdausy
on 2024/09/25 13:13
on 2024/09/25 13:13
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -17,9 +17,9 @@ 17 17 18 18 This microlearning describes what configuration that you will have to do in the Create phase, based on what you have configured in the Design phase, to enable failover for systems connecting with your model. The grouping and failover functionality is relevant when faced with maintenance and outages of systems connected to your model. The failover functionality assists in that case and allows you to have a fallback option on an active connection. 19 19 20 -== 3. DesignPhase Configuration ==20 +== 3. Create Phase Configuration == 21 21 22 -== 3.1 S olutionDesign==22 +== 3.1 Settings == 23 23 24 24 To configure failover for systems that are connecting with your model, we first need to go to the Design phase. In your Design>Solution Design, find and open the details of the system that you want to enable failover for. Once you do that, then you need to make sure that "Multiple runtimes" option is selected for this system, which is logical since we want to have a second runtime running in case of failover situations (e.g., outage, maintenance, etc.). Afterward, you will see the "Number of runtimes" and "Run in failover" fields. To enable failover, make sure that you fill in 2 as the "Number of runtimes", before selecting the "Run in failover" checkbox. See the screenshot below as an example. 25 25